About
About Productivity Toolbox.
Productivity Toolbox is a Navisworks® add-in that packages the workflows Navisworks ships without. It is a focused set of property-driven tools for BIM coordination teams.
The product
The plugin installs as a native ribbon tab inside Navisworks Manage and Navisworks Simulate 2021 to 2027. Its modules are clash result grouping and renaming with a clash matrix in Excel, property-driven selection and search sets, viewpoint isolation and color-coding, model explode by property, a Selection Set Manager that finds every set containing an element, image/HTML/Excel reports, custom quantity take-offs, property import and export, a Section Box Manager, TimeLiner tasks generated from selection set folders, rule-based clash auto-grouping and a clash history workbook. The clash tools need Navisworks Manage, because Simulate has no Clash Detective. The features page describes each module.
The problem
Navisworks is an excellent model review application, but many coordination workflows are left to the coordinator as manual work: grouping hundreds of clash results, generating consistent viewpoint decks, and rendering the same set of views for every group. On a typical week that is hours of repetitive effort that the model's own properties should be doing for you.
The publisher
Productivity Toolbox is built and maintained by AMPQ (opens in a new tab) , a product development, technical consulting and platform engineering practice led by Rade Tomovic, who has a civil engineering background and direct BIM coordination experience on major building and infrastructure projects. Updates are shipped on a rolling schedule, and support goes directly to the maintainer. No ticket queue.
Distribution and billing
The plugin is sold exclusively through the Autodesk® App Store. Autodesk handles installation, licensing, and billing. This site exists for product information and trust. It does not process payments, manage accounts, or host downloads.