Skip to content

Documentation

Productivity Toolbox user guide

Every ribbon command and dock pane, in ribbon order, with the dialogs and the settings behind them. Written against Navisworks Manage 2027; the tools work the same way on Navisworks 2021 to 2027, except where a chapter says otherwise.

Pressing F1 on a ribbon button, or the Help button on the ribbon, opens the matching section of this guide.

  1. Chapter 1

    Introduction

    What Productivity Toolbox does, how to install and license it, and how the ribbon, help and error dialogs work.

  2. Chapter 2

    Group Elements

    Build nested groups from property rules, colour the model, save them as selection or search sets, and reuse rules on the next model.

  3. Chapter 3

    Clash Manager

    Run and batch-update clash tests, review and group results, export Excel reports and history, and create tests from a matrix.

  4. Chapter 4

    Reporting

    Quantity take-offs to Excel or CSV, one image per group, and browsable HTML reports.

  5. Chapter 5

    Other Tools

    Selection Set Manager, Section Box Manager, Copy Revit IDs, Export and Import Properties, Explode Model and Generate Timeline.