Selection and search sets from property rules, rerun on every model update
Nested selection and search sets generated from property rules, coloured in the model, exported as XML and rerun on the next model.
Manage and Simulate
Features
Productivity Toolbox adds one ribbon tab with four tool panels and a Help panel to Navisworks Manage and Navisworks Simulate 2021 to 2027. Every module is driven by the properties already in the model, so the same rules run again after each model update. All 11 modules are in version 3.0.0.
Nested selection and search sets generated from property rules, coloured in the model, exported as XML and rerun on the next model.
Manage and Simulate
Colour the model by property value and export saved viewpoints that keep the group tree and its colours.
Manage and Simulate
Group, rename and set the status of clash results in batch, and find every clash touching an element. Auto-group a whole test by level, grid, assignee, status, source file or item property.
Navisworks Manage only
Save the clash matrix from selection set folders, fill in the tolerances and load it back as clash tests, with nested folders, a load preview, the Matrix report and a clash history workbook.
Navisworks Manage only
One rendered image per group, an HTML report that prints one group per page, and Excel clash reports with a summary, a pivot, a set-by-set matrix and a history.
Manage and Simulate
Sum quantities for every group at the deepest level of a grouping and export them to an Excel workbook with a pivot summary, or to CSV.
Manage and Simulate
Spread a grouping's elements apart along up to three axes so a breakdown can be inspected piece by piece, then reset it.
Manage and Simulate
Select elements in the model and see every selection or search set that contains them, nested folders included.
Manage and Simulate
A pane that lists the Revit rooms under their levels. One click sections the view to that room or level, and checked rows are sectioned together.
Manage and Simulate
Pick a selection set folder and get the matching TimeLiner task tree, ordered by a construction-sequence blueprint, with planned dates laid out from a start date.
Manage and Simulate
Export chosen properties per element to Excel or CSV, write spreadsheet values back onto matching elements, and copy Revit ids for Select by ID.
Manage and Simulate
Ready to try it
No feature gating, no credit card on the trial. Install through the Autodesk App Store, use the plugin on real projects for 30 days, then decide. Demo files are included so each workflow can be tried before a project model is opened.
30 days, unrestricted. Download it from the Autodesk App Store and run the installer; no administrator rights needed.