Skip to content

Tutorials

Navisworks® plugin tutorials.

Short videos showing every Productivity Toolbox workflow inside Navisworks. Videos do not load until you click. Each poster is also a link to YouTube if you prefer to watch there.

Getting started

2 videos
  • Productivity Toolbox overview

    A short walkthrough of the plugin and the workflows it adds to Navisworks.

    Jul 2020

  • Settings

    Configure the plugin and persistent options before running any workflow.

    Aug 2020

Selection and grouping

4 videos
  • Group Elements

    Generate selection and search sets automatically from property hierarchy.

    Aug 2020

  • Selection Set Manager

    Work with selection and search sets, including the new search-set icons in the Selection Set Manager.

    Aug 2020

  • Explode Model

    Split the federated model by property to target a review at a specific system, level, or contractor.

    Aug 2020

  • Cache Properties

    Cache categories and properties to speed up searches inside Group Elements, especially on large models.

    May 2024

Clash workflows

3 videos
  • Clash Manager

    Run and batch-update clash tests, work with run groups, and export clash reports for repeatable reviews.

    Sep 2020

  • Clash Matrix

    Build, save, and load a clash detection matrix from selection set folders.

    May 2024

  • Clash Results

    Filter, rename, and manage clash results with the Clash Result Manager.

    Jun 2024

Reports and take-offs

3 videos
  • Reporting

    Generate image, HTML, and Excel reports from selections, viewpoints, and clash results.

    Oct 2020

  • Export Properties

    Export element properties from selections and source files to Excel.

    Oct 2020

  • Quantity Take-offs

    Configure and export custom quantity take-offs driven by model properties.

    Nov 2020